For an average installation, we start by attaching aluminum tracks to the perimeter of a room and then the fabric - which is custom sized for each project - is heated, stretched and secured into the tracks via the electro-magnetically welded 'harpoon' perimeter. This creates a pristine surface that is easy to clean and remains virtually maintenance free for an excess of 20 years.
Barrisol's® minimal weight (180 g/sm) allows us to span unlimited areas with very little structural support, saving both time and money. Special reinforcing rings, pot light mounts, separators and other accessories allow for the incorporation of lighting, sprinklers and other mechanical devises. If desired, removable panels, zippers and other means of access can be incorporated into ceiling structures. An average room can be installed in day or two with no painting or dust and remains 100% recyclable right down to the small cardboard box that it comes in. |
Lead Time
Lead time is typically 4-5 weeks after we have received the purchase order and confirmed the dimension.
Allow an additional 1-2 weeks for printed and/or acoustic ceilings.
Allow an additional 1-2 weeks for printed and/or acoustic ceilings.